Original idea + Problems.
Originally, in the proposal my idea for the FMP was to collaborate with a fashion designer and create a short fashion film for her collection which would be featured on the website that I am building as well as all my other social media accounts. Youtube/Facebook/Instagram.
Below, is the schedule which I created in January which I was sure it would be followed to plan. However one of the mistakes I made was relying heavily on a designer which ended up dropping out on the 15th of February which meant that I had to find a different designer to collaborate with which wasted a lot of time.
This was a major step back for me as the TREATMENT, narrative and face charts that I had previously made was based around the designer. This left me extremely stressed and ruined my time schedule however I decided to learn from my mistakes and act as quickly as I could.
What I learned from this experience, is the fact that relying on others does not always work out therefore 1 or 2 back up NOT only designers but models, videographers are needed in case of any unexpected circumstances.
As my Final Major Project relies heavily on the model, designer and the videographer, I noticed another mistake that I made. I was focusing too much on perfecting the film so much that I forgot to take care of my team and make everyone feel welcome. I quickly arranged to meet up with the videographer and the designer on the 19th of February to introduce myself and tell them the brief in person rather than emailing. This worked out perfectly and I could not be happier with my team.
I also found back up models, designs and a videographer to be sure. This whole experiences made me realise that I need to think very carefully about each step and problems that might occur and to come up with solutions before hand to ensure everything goes smoothly especially since time is of the essence.
 |
| Original Schedule. |
I begun the process by creating a new schedule which I printed out and keep it with me to look back on.
February
19th - Meet with Videographer
20th - Meet with Designer
21st - Build website in IT lesson - 9-10am, 4-5pm
22nd- Build Website in It lesson - 11-12pm
23rd- Finish the new narrative and shots - Send the location approval letter
24th - Meet with the whole team and go through everything and hand them a print out of the brief, the script
25th-28th Meet with the models for a costume fitting, and practise scripts for a few days.
29th- Get all the right equipment
March
5th/6th- SHOOT THE FILM
7th-27th- Edit the film + build website
April- Finish the final edit, diary, website
MAY 1ST - HAND IN.